Pastushkov, G. P., and M. A. Kisel. “PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION”. Academic journal Industrial Machine Building Civil Engineering 2, no. 49 (October 17, 2017): 116–125. Accessed December 23, 2025. https://ojs33.nupp.edu.ua/znp/article/view/832.